Linear regression | ||||||
---|---|---|---|---|---|---|
All (n = 104) | p | DM (n = 45) | p | Controls (n = 59) | p | |
% change in cWMH volume per 1 m/s increase in PWV (95% CI)s | ||||||
Crude | 34 (20–51) | < 0.01 | 32 (12–56) | < 0.01 | 48 (8–102) | < 0.05 |
Adjusteda | 16 (1–32) | < 0.05 | 18 (− 5 to 47) | 0.13 | 31 (− 8 to 87) | 0.13 |
% change cWMH volume if PWV > 8.94 m/s | ||||||
Crude | 208 (73–451) | < 0.01 | 214 (57–526) | < 0.01 | 218 (18–756) | < 0.05 |
Adjusteda | 92 (2–263) | < 0.05 | 88 (− 20 to 339) | 0.14 | 161 (− 5 to 618) | 0.06 |